Execution Story: K-Electric’s grid station required a finish resilient to constant dust, heavy environmental exposure, and electrical utility surroundings. Prime Texture applied Graphy textures across perimeter walls and control buildings, with additional protective sealing. The project highlighted our expertise in industrial-grade finishing where both safety and longevity were critical.