Execution Story: Situated in the dry and dusty climate of Hub, Balochistan, this project required a finish that could endure severe weather fluctuations and sand-laden winds. Prime Texture applied Graphy texture to the administrative offices of CDHGC, ensuring resistance against abrasion and long-term deterioration. Our technical approach balanced durability with a refined appearance, enabling the office block to stand as a professional, enduring workspace in an industrial zone.